Monday 30 March 2009

Pendolino at maximum tilt?

(LNW) At 2200, as Virgin Pendolino unit No. 390006 was being shunted from the wheel lathe onto the Down Carriage line at Wembley Carriage Sidings South, the signaller at Carriage Sidings South signalbox inadvertently moved CS4 points under the unit, thereby causing an irregular movement, and resulting in the unit becoming derailed by two bogies, fouling the Down & Up Carriage lines and colliding with Pendolino unit No. 390008, the latter of which at the time was stationary on the Up Carriage line, having arrived at 2151 per 5A78, HF, 2135 London Euston – Wembley Carriage Sidings. Upon observing the approaching unit, the driver of unit No. 390008 jumped clear, and was badly shaken. The force of impact resulted in unit No. 390008 leaning at a 45 degree angle.

Which brings to three the number of 390's damaged by NR - how long before there are none left?

UPDATE: This from an expert...

If the signaller was able to move the points, they can't have been locked by track circuits.

Unusual at such a place with power operated points.


31422
signalman